Here's my challenge...when I built the structure using 2x6 studs on a pier style foundation PC was undiscovered by us...once found I immediately flipped the script for obvious reasons...however slip forming between studs seems a lot of work but so are the blocks and even with rectangle forms some cutting will be required due to mix consistency, temperature and how much beer I haven't drank..if doing it over I think rubble trench and slip form would be the most practical, but then again I'm someone who can and have slept in a tree. --- On Wed, 3/21/12, JUDITH WILLIAMS <williams_judith@hotmail.com> wrote:
|
__._,_.___