My Question is; "Has anyone built a pier and beam foundation, at least
24" out of the ground, top it with a treated 2x8 mud seal, applied rim
joist and floor joist of treated 2x8's then applied wire mesh to the
bottom of the floor joist after installing rough-in plumbing, and then
filling between the joist on top of the wire mesh with papercrete, then
installing a wood floor and complete the structure with papercrete
walls, topped with a 2x8 treated top plate and finish off with truss
rafters?"

Bob

------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/papercreters/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/papercreters/join
(Yahoo! ID required)

<*> To change settings via email:
mailto:papercreters-digest@yahoogroups.com
mailto:papercreters-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
papercreters-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/