Yes, I put down a layer of polyethylene and cut long slots in it for drainage. Underneath that is deep sand. I let it dry for weeks before pouring the concrete cap, and the edges of the pc under slab are tied to the foot thick walls. Any moisture that was reintroduced by the concrete has long ago wicked out through the walls and the whole structure is as dry as a bone.
Spaceman does your slab have plastic under the papercrete? I was wondering because of the need to get the moisture out for drying.
No virus found in this message.
Checked by AVG - www.avg.com
Version: 2013.0.3272 / Virus Database: 3162/6235 - Release Date: 04/09/13
__._,_.___