Re: [papercreters] slab



Yes, I put down a layer of polyethylene and cut long slots in it for drainage. Underneath that is deep sand. I let it dry for weeks before pouring the concrete cap, and the edges of the pc under slab are tied to the foot thick walls. Any moisture that was reintroduced by the concrete has long ago wicked out through the walls and the whole structure is as dry as a bone.
 

On 4/9/2013 10:04 PM, michael joyce wrote:
Spaceman does your slab have plastic under the papercrete? I was wondering because of the need to get the moisture out for drying.