[papercreters] Re: Brick Press

Considering the nature of papercrete might something like this be a better tech? -- http://www.youtube.com/user/DoubellMachines?feature=watch

The only issue would be to work with a drier mix possibly?

--- In papercreters@yahoogroups.com, Jeff Jones <yvairguy@...> wrote:
>
> Kind of my thought, here you are using a cast off material to build a
> structure but whats the point if you are going to spend 25k on a press. I
> would make it to where it could do rammed earth as well as cement block.
> Also need some holes to use as raceways. I agree a manual press may work

[[snip]]



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/papercreters/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/papercreters/join
(Yahoo! ID required)

<*> To change settings via email:
papercreters-digest@yahoogroups.com
papercreters-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
papercreters-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/

[papercreters] Re: Flooring.



Excellent job Tim.  That's a good article on tamped earth flooring.


Here are a few other options to consider for inexpensive flooring.


1.  Don't worry about it right now.  Just build a quality BASE for a good floor, then continue with construction.  There are many good reasons for doing this.  Building a final finished floor should be one of the last steps in completing any structure.  This is because you don't want to damage a finished floor during the construction process.  Just building a quality base for whatever floor you are planning is sufficient early in the process.  You'll be able to work faster when you don't have to stress over whether you are scratching up the floor.

2.  David Easton is the rammed earth guru that has been a pioneer in soil cement flooring.  Take a look at his process.
http://terrashouse.rammedearthworks.com/2009/06/slab-floor-phase-one.html
http://terrashouse.rammedearthworks.com/2009/06/pouring-floors_23.html
http://terrashouse.rammedearthworks.com/2009/06/soil-cement-finish-slab-posted-by-taj.html

3.  If you just build a base for the floor now and wait to install the finished floor, you may discover a cheap or free option that someone else is throwing away.  Perhaps you'll stumble across some hardwood flooring someone is throwing away?  

4.  Another inexpensive option is cobblewood flooring.
That is an extremely inexpensive system for installing a wood floor.  The trick is that it is end cuts from boards, logs, or even scraps.  The endgrain is the side that is up.   Simply glue the endgrain endcuts down to your subfloor with standard adhesives pretty much like laying ceramic tile.  Instead of grout, you use polyurethane mixed with sawdust from cutting off all the endgrain tiles.  Then you simply sand and finish the whole floor just like any other wood floor.  This system allows someone to find scraps and free chunks of wood and turn them into something amazing.

5.  Last, but probably MOST IMPORTANT.
The original poster talked about building a 2600sqft house.
The easiest way to bring the budget in line with whatever your current finances are is to SCALE DOWN.  Build a smaller house, but leave your options open to build an addition later as finances allow.  Getting a mortgage as was mentioned is a prescription for nightmares.  Wouldn't you rather build a smaller house that you can afford right now, and never pay any interest?  You can always expand and make it bigger when your finances are better able to support the process.  Just because you have started a big footprint for a 2600 sqft home doesn't mean you have to finish all 2600 sqft in phase 1.  You can always look at your plans and figure out a way to build half of it now and the other half later, or whatever fraction of the house makes sense right now.

--- In papercreters@yahoogroups.com, "timoteoharvey" wrote:
>
> Rusty,
>
> Here's an article on earthen floors that I found online some time back.
>
> Tim
>
> ///////////
>
> Tamped Earth Floors Unstabilized Earthen Floor Using Road Base
> by Frank Meyer
>
> [Note: This technique by Frank Meyer is a alternate method for making earthen floors. Tamped earth floors dry much faster than poured adobe and also cracks less.]
>
> A few years ago, when asked to make an earthen floor, I started by collecting all the soil types available in our area. Austin, Texas is situated in a geologically diverse area, so I got samples from several places including the building site, my backyard and all the commercially available dirts, loams and road bases. After weeks of playing in the dirt, mixing in stabilizers and trying to strengthen and harden the earth to make it suitable for a floor, I came to an interesting conclusion. One particular road base would make the hardest, prettiest and quickest floor without any stabilizers at all. Its rich red color and excellent blend of silt, clay, sand and gravel made test bricks that were more impressive than anything else I came up with.
>
> Not all road bases are created equal. The one I chose is what is known here as city base. It has been approved by road building engineers for use in building roads and streets in Austin. (A quest that seems to have no end). It originates in a quarry where the material is taken from the earth and the silt, clay, sand and gravel are separated, then reblended to proportions specified by engineers. It has a plasticity index of 12 which relates to the way it shrinks and swells. It costs $2.48 per ton plus hauling. A 500 sq. ft. floor will require two twelve-ton truckloads costing $200-$300 delivered.
>
> I recently set out to do a floor using site-available clay. We did several tests, both stabilized and unstabilized. Though the owner of the building was adamantly in favor of using the "dirt under his feet," after comparing the color and hardness of our site tests with road base tests, he changed his mind and we are presently working on his floor using road base.
>
> By using this material, and applying basic roadbuilding techniques, we have a big advantage over traditional poured earth floors. The process uses relatively little water, thereby requiring a much shorter drying time. It can typically be walked on a day or two after installing.
>
> Before proceeding with the installation process, it is necessary to consider vapor barriers. I have done earth floors with and without vapor barriers. Unfortunately, for the sake of observing their performance, conditions here have not varied enough for me to form an accurate opinion, as drought conditions have persisted recently. My feeling is, if in doubt, use a vapor barrier. If your location is high and dry and you want your floor to "breathe," consider not using one.
>
> To begin the process of building our floor, the ground should be fairly level, smooth, compacted and at least 6" below the planned finished height. If a vapor barrier is being used, a layer of sand should be spread an inch or two thick below and above the vapor barrier. This prevents gravel from puncturing it. The first layer of road base is now applied about 2" thick and wetted with a hose or watering can. There is no need to soak it. Just get it wet enough so the silt and clay stick to the aggregate. It must then be compacted. A plate compactor, available at tool rental outlets, works well. Be sure to vent the building with fans if using a gas-powered compactor. Hand-tamping is slower but much quieter and without fumes. Hand-tamping the edges works best even if a powered compactor is used. Wooden tampers are easily made or a steel plate welded to a piece of pipe works nicely. Another layer just like the other follows again and again until we are about 1" from our finish height. When estimating the amount of material to use, figure it will lose about one-third of its original volume when compacted.
>
> At this point we need to level the floor. First we screen out the large aggregate from the base. Using 3/8" hardware cloth or similar screening material, we sift the road base. A simple wood frame with the screen attached works well. Having removed the large aggregate, we are left with a mixture of silt, clay, sand and gravel no bigger than 3/8". This is layered on and leveled off using screed boards much like concrete workers use. By dragging our screed across two level boards set at finish height, we knock down the high spots and fill in the low spots. This process can also be applied to each layer of base thereby controlling the level layer by layer.
>
> After leveling, this mix must be wetted again and tamped, making sure that it bonds with the layer below. For the top coat we screen the 3/8" material again, this time using 1/8" hardware cloth. This fine mixture can be applied dry and wetted like all the preceding layers or mixed wet and troweled on. The most important thing at this point is to make sure it is bonding with the layer below. A little extra water on the coat below the top coat seems to help. Also, scratching through with a trowel will help the two layers bond. I have had better success applying the top coat dry. The top coat is not compacted, but hand-troweled and burnished, using enough water to make it bond and be workable. Trial and error will give you a feel for it.
>
> We seal our floor only after it is thoroughly dry. In the summer in Texas thorough drying may take only a few weeks. In cooler, moister climates it may take several months. The floor can be used during this drying period. Cracks from drying, and any chipping or gouging that may occur while drying, can be patched by again screening the road base, this time using window screen. What is left is a fine powder of silt, clay and fine sand. This mixture makes an excellent patching and burnishing material. It can be sprinkled on, wetted and blended in with the floor. The more time and patience you have at this point the better your results will be, as burnishing with a pool trowel brings out the natural beauty and character of the earth.
>
> The best sealer I have found is boiled linseed oil, thinned with turpentine and brushed on in several coats. (The odor dissipates in a week or two.) I also used Palmer 9400 Impregnant (Phone # 800/252-3690, 800/421-2487 or 301/898-7848) on one floor and sodium silicate on another.
>
> This is an all-natural non-toxic floor that has relatively low embodied energy. With time, patience and an affinity for getting dirty, anyone can do it. Enjoy!
>


__._,_.___


Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___

Monday, April 29, 2013

Re: [papercreters] Re: Brick Press



Kind of my thought,  here you are using a cast off material to build a structure but whats the point if you are going to spend 25k on a press. I would make it to where it could do rammed earth as well as cement block. Also need some holes to use as raceways. I agree a manual press may work well and put the ability to build a structure within the capabilities of many people with limited finances.

On Apr 29, 2013 8:01 AM, "Forrest Charnock" <fpcharnock@gmail.com> wrote:
 

It seems a really neat machine but the mechanical skills necessary to
build one are beyond the vast majority . Even fairly skilled mechanics
will struggle to build one. On the other hand a good welder should be
able to make a very good hand brick press.

On 4/28/13, Jeff J <yvairguy@gmail.com> wrote:
> 25k yikes, maybe i need to start building some, i wonder if that was a
> prototype? i could see a few improvements i would make
>
>
> --- In papercreters@yahoogroups.com, "Ron" <ronerichter@...> wrote:
>>
>> I have been sharing my passion for papercrete with friends for quite some
>> time and recently it paid off. A friend shared with me a site that is
>> absolutely exhilarating. It is Open Source Ecology a site where they are
>> building (DIY), making plans, and sharing to the world 100 "civilization
>> tool kit" machines. They have a few done already and one is a CEB press.
>> With a few modifications I believe this could produce papercrete blocks
>> far cheaper than the $25,000.00 Barry Fuller wants for one of his.
>>
>> The main site is: http://opensourceecology.org/ and a link to the wiki on
>> the CEB press is:
>> http://opensourceecology.org/wiki/Civilization_Starter_Kit_DVD_v0.01#CEB_Press
>>
>> Enjoy!
>> Ron
>>
>
>
>

--
Forrest Charnock



__._,_.___


Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___

[papercreters] Re: Brick Press

Ron,

The work of GVCS is good. They have shown videos of their CEB press working and it seems to be doing well. But I believe a CEB press requires a fairly high pressure. I believe that pressing papercrete is a good idea, but the pressure needed will be only 1/10 or 1/20 of that for CEB.

Also CEB, I assume. produces little water when squeezed. Papercrete will produce a lot, so you may need to build in water channels.

They have a new version at:

<http://opensourceecology.org/wiki/CEB_Press_IV>

Bobby

--- In papercreters@yahoogroups.com, "Ron" <ronerichter@...> wrote:
>
> I have been sharing my passion for papercrete with friends for quite some time and recently it paid off. A friend shared with me a site that is absolutely exhilarating. It is Open Source Ecology a site where they are building (DIY), making plans, and sharing to the world 100 "civilization tool kit" machines. They have a few done already and one is a CEB press. With a few modifications I believe this could produce papercrete blocks far cheaper than the $25,000.00 Barry Fuller wants for one of his.
>
> The main site is: http://opensourceecology.org/ and a link to the wiki on the CEB press is: http://opensourceecology.org/wiki/Civilization_Starter_Kit_DVD_v0.01#CEB_Press
>
> Enjoy!
> Ron
>




------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/papercreters/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/papercreters/join
(Yahoo! ID required)

<*> To change settings via email:
papercreters-digest@yahoogroups.com
papercreters-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
papercreters-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/

Re: [papercreters] Re: Brick Press

It seems a really neat machine but the mechanical skills necessary to
build one are beyond the vast majority . Even fairly skilled mechanics
will struggle to build one. On the other hand a good welder should be
able to make a very good hand brick press.

On 4/28/13, Jeff J <yvairguy@gmail.com> wrote:
> 25k yikes, maybe i need to start building some, i wonder if that was a
> prototype? i could see a few improvements i would make
>
>
> --- In papercreters@yahoogroups.com, "Ron" <ronerichter@...> wrote:
>>
>> I have been sharing my passion for papercrete with friends for quite some
>> time and recently it paid off. A friend shared with me a site that is
>> absolutely exhilarating. It is Open Source Ecology a site where they are
>> building (DIY), making plans, and sharing to the world 100 "civilization
>> tool kit" machines. They have a few done already and one is a CEB press.
>> With a few modifications I believe this could produce papercrete blocks
>> far cheaper than the $25,000.00 Barry Fuller wants for one of his.
>>
>> The main site is: http://opensourceecology.org/ and a link to the wiki on
>> the CEB press is:
>> http://opensourceecology.org/wiki/Civilization_Starter_Kit_DVD_v0.01#CEB_Press
>>
>> Enjoy!
>> Ron
>>
>
>
>


--
Forrest Charnock


------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/papercreters/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/papercreters/join
(Yahoo! ID required)

<*> To change settings via email:
papercreters-digest@yahoogroups.com
papercreters-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
papercreters-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/

[papercreters] Re: Flooring.

Rusty,

Here's an article on earthen floors that I found online some time back.

Tim

///////////

Tamped Earth Floors Unstabilized Earthen Floor Using Road Base
by Frank Meyer

[Note: This technique by Frank Meyer is a alternate method for making earthen floors. Tamped earth floors dry much faster than poured adobe and also cracks less.]

A few years ago, when asked to make an earthen floor, I started by collecting all the soil types available in our area. Austin, Texas is situated in a geologically diverse area, so I got samples from several places including the building site, my backyard and all the commercially available dirts, loams and road bases. After weeks of playing in the dirt, mixing in stabilizers and trying to strengthen and harden the earth to make it suitable for a floor, I came to an interesting conclusion. One particular road base would make the hardest, prettiest and quickest floor without any stabilizers at all. Its rich red color and excellent blend of silt, clay, sand and gravel made test bricks that were more impressive than anything else I came up with.

Not all road bases are created equal. The one I chose is what is known here as city base. It has been approved by road building engineers for use in building roads and streets in Austin. (A quest that seems to have no end). It originates in a quarry where the material is taken from the earth and the silt, clay, sand and gravel are separated, then reblended to proportions specified by engineers. It has a plasticity index of 12 which relates to the way it shrinks and swells. It costs $2.48 per ton plus hauling. A 500 sq. ft. floor will require two twelve-ton truckloads costing $200-$300 delivered.

I recently set out to do a floor using site-available clay. We did several tests, both stabilized and unstabilized. Though the owner of the building was adamantly in favor of using the "dirt under his feet," after comparing the color and hardness of our site tests with road base tests, he changed his mind and we are presently working on his floor using road base.

By using this material, and applying basic roadbuilding techniques, we have a big advantage over traditional poured earth floors. The process uses relatively little water, thereby requiring a much shorter drying time. It can typically be walked on a day or two after installing.

Before proceeding with the installation process, it is necessary to consider vapor barriers. I have done earth floors with and without vapor barriers. Unfortunately, for the sake of observing their performance, conditions here have not varied enough for me to form an accurate opinion, as drought conditions have persisted recently. My feeling is, if in doubt, use a vapor barrier. If your location is high and dry and you want your floor to "breathe," consider not using one.

To begin the process of building our floor, the ground should be fairly level, smooth, compacted and at least 6" below the planned finished height. If a vapor barrier is being used, a layer of sand should be spread an inch or two thick below and above the vapor barrier. This prevents gravel from puncturing it. The first layer of road base is now applied about 2" thick and wetted with a hose or watering can. There is no need to soak it. Just get it wet enough so the silt and clay stick to the aggregate. It must then be compacted. A plate compactor, available at tool rental outlets, works well. Be sure to vent the building with fans if using a gas-powered compactor. Hand-tamping is slower but much quieter and without fumes. Hand-tamping the edges works best even if a powered compactor is used. Wooden tampers are easily made or a steel plate welded to a piece of pipe works nicely. Another layer just like the other follows again and again until we are about 1" from our finish height. When estimating the amount of material to use, figure it will lose about one-third of its original volume when compacted.

At this point we need to level the floor. First we screen out the large aggregate from the base. Using 3/8" hardware cloth or similar screening material, we sift the road base. A simple wood frame with the screen attached works well. Having removed the large aggregate, we are left with a mixture of silt, clay, sand and gravel no bigger than 3/8". This is layered on and leveled off using screed boards much like concrete workers use. By dragging our screed across two level boards set at finish height, we knock down the high spots and fill in the low spots. This process can also be applied to each layer of base thereby controlling the level layer by layer.

After leveling, this mix must be wetted again and tamped, making sure that it bonds with the layer below. For the top coat we screen the 3/8" material again, this time using 1/8" hardware cloth. This fine mixture can be applied dry and wetted like all the preceding layers or mixed wet and troweled on. The most important thing at this point is to make sure it is bonding with the layer below. A little extra water on the coat below the top coat seems to help. Also, scratching through with a trowel will help the two layers bond. I have had better success applying the top coat dry. The top coat is not compacted, but hand-troweled and burnished, using enough water to make it bond and be workable. Trial and error will give you a feel for it.

We seal our floor only after it is thoroughly dry. In the summer in Texas thorough drying may take only a few weeks. In cooler, moister climates it may take several months. The floor can be used during this drying period. Cracks from drying, and any chipping or gouging that may occur while drying, can be patched by again screening the road base, this time using window screen. What is left is a fine powder of silt, clay and fine sand. This mixture makes an excellent patching and burnishing material. It can be sprinkled on, wetted and blended in with the floor. The more time and patience you have at this point the better your results will be, as burnishing with a pool trowel brings out the natural beauty and character of the earth.

The best sealer I have found is boiled linseed oil, thinned with turpentine and brushed on in several coats. (The odor dissipates in a week or two.) I also used Palmer 9400 Impregnant (Phone # 800/252-3690, 800/421-2487 or 301/898-7848) on one floor and sodium silicate on another.

This is an all-natural non-toxic floor that has relatively low embodied energy. With time, patience and an affinity for getting dirty, anyone can do it. Enjoy!



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/papercreters/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/papercreters/join
(Yahoo! ID required)

<*> To change settings via email:
papercreters-digest@yahoogroups.com
papercreters-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
papercreters-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/

[papercreters] Re: Flooring.

Here's another manufacturer of ceb presses - manual and hydraulic
http://www.ferncometal.com/products.htm

Tim

--- In papercreters@yahoogroups.com, "Jeff J" <yvairguy@...> wrote:
>
> you could lay down a cement base and lay something like slate or flagstone right on the caliche as long as the caliche is stable, you would want to run a compactor over it before you started laying and as you would level the stone the caliche would only have to be close to level. I have actually seen whole houses done this way, the house is built on a foundation and then the floors are put in later on the bare earth, not even as good as the caliche in my opinion. tried to find some pictures but couldn't
>
> --- In papercreters@yahoogroups.com, "Rusty S" <slaytonfarms@> wrote:
> >
> > Hello all,
> >
> > First time poster. I am so frustrated with my build and need some guidance. We live in West Central Texas. We are at a stand still on our build because of the floors. Here is what we have done so far.
> >
> > I have buried 4 layers of tires rammed full of caliche and have 2 layers above ground making the foundation done.
> > I put in all of the below ground blackwater plumbing. This includes the septic tank and leach field.
> > I put in 6 inches of caliche, leveled, and packed as a subfloor.
> > This was all finished 18 months ago. Then we started trying to save the 8k needed to pour a concrete slab inside the Tire Foundation. But life keeps throwing us curve balls and we can never quite raise the money to the full 8k. We even got it to 7k in December and life happened taking the lot of it. On a Paramedics wage that was a chore.
> > (You getting the whole story to get a full appreciation of my frustration.)
> > The Dang Slab is just not going to happen so we are looking for something I can do myself and as money comes in. Because we are not going to take out a loan, this is the only absolute in the build.
> >
> > Now with the questions. I have seen alot of people doing adobe floors and they always involve saying that the will Groove and or pit depending on what kind of furniture you put on it. That sounds horrible to me. I found CEBs (Compressed Earth Bricks) stabilized with concrete done by a family and was excited about that. But to buy a machine to make the bricks is 25k, DANG.
> >
> > The floor plan is huge and a bit embarrassing as we homeschool and have incorporated a classroom and office into the home, 2600 sq ft.
> >
> > I can build almost anything, but this floor thing is driving a wedge into the effort and I need help. My wife has all but given up on it and I need a solution or I will be forced to mortgage my 6th generation homestead to go the loan route and I hate that with all I am. Any and all suggestions are appreciated.
> >
> > Rusty
> >
>



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/papercreters/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/papercreters/join
(Yahoo! ID required)

<*> To change settings via email:
papercreters-digest@yahoogroups.com
papercreters-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
papercreters-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/